Here is a list of proposed projects we hope to complete in 2008. |
|
This large project will involve grooming and re-mulching the full length (1.2 mi.) of the main trail. The project was completed 6/14/08 |
|
Signs describing the common sense rules for the Conservancy will be added to the existing trail designation posts. This should be done by July. |
|
The board has approved a study by a private party to install and maintain habitat boxes for bats within the Conservancy. There is no timetable for this. |
|
There are some large, nearly dead trees adjacent to the Conservancy boundaries, that will probably need to be brought down in 2008. Timing as required. |
|
This project will address some areas of the trail where property or natural drainage tends to wash away the mulch on the trail. This will be done in April. |
|
Trail Re-mulching |
|
Tree Felling |
|
Habitat Box Study |
|
Rules Signage |
|
Trail drainage |

|
Proposed Project List 2008 |
|
Completed Project List 2007 |
|
Here is a list of projects we completed in 2007 |
|
· A walkway was designed and built over a permanently soggy portion of the path on the East branch of the trail just north of the Ravines Cul-de-sac entrance. · New signs were designed, purchased and installed showing the trail entrances and benches. A new sign was added for the southwest entrance. · Two benches that had deteriorating supports were reset in new concrete. · The trails around the North lake were widened and the spaces around all benches were trimmed of weeds and brush. · Several remaining stumps in the trail were cut flush with the ground. |
|